Construction Systems

  • Location: Neumarkt/Jura West, Germany
  • Architects: Weimann Ingenieure, Dettelbach
  • Completion:  2014
  • Client: MICKAN General-Bau-Gesellschaft Amberg
  • Supporting structure:Sign Gantry in MERO-KK system

On the German motorway 3 Nürnberg-Regensburg between the junction Neumarkt-Ost and junction Velburg, a nationwide unique pilot project for "compact truck parking" is under construction. Two rows each for truck parking are interlinked in South-East direction, and by means of a telematics system the departure times for the clearance of each parking row are determined.

Thus, scarce space can be used effectively, without wasting it.

MERO's asset is the free span of 50 m. The sign gantries are realized in KK System. The system height is one meter, with a module of 1.5 m x 2.0 m. 120 sqm are cladded with perforated plates. MERO was in charge of the structural analysis, supply and erection.

Jura neu

Jura4 Jura1
 Jura2 Jura5 Jura8
 Jura6 Jura3
 

 

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.

https://www.youtube.com/channel/UCPvekf1CiPH7Jeg5VhnVfEw