Project report - International
VW Shanghai
12.2019
Engine research and development factory
5,000 m² Type 2-600 and type 6 N32 with alu checker plate covering
Project report
5,000 m² Type 2-600 and type 6 N32 with alu checker plate covering
Project report
ERBER Group Campus 1
02.2019
Corporate Headquarters
6,600 m² Type 6 Calcium sulfate
350 m² Combi T
210 m² Combi T Aqua
150 m² Heavy duty floor Type 2
Project report
6,600 m² Type 6 Calcium sulfate
350 m² Combi T
210 m² Combi T Aqua
150 m² Heavy duty floor Type 2
Project report
Hana Bank
12.2018
Hana Bank
28.800 m² access floor Type 6 calcium sulfate with oak-wood parquet
2.400 m² access floor Type 6 calcium sulfate with walnut-wood parquet
2.400 m² access floor Type 6 calcium sulfate without covering
Project report
28.800 m² access floor Type 6 calcium sulfate with oak-wood parquet
2.400 m² access floor Type 6 calcium sulfate with walnut-wood parquet
2.400 m² access floor Type 6 calcium sulfate without covering
Project report
China Construction Bank
02.2018The Butterfly Project - Dubai
05.2017Msheireb Dohaland Phase 1C - Doha, Qatar
03.2017
living, commerce and office building
Total area 15.000 m²
Raised access floor Typ 6 NB 38,
Hollow floor Combi T NB 38
project report
Total area 15.000 m²
Raised access floor Typ 6 NB 38,
Hollow floor Combi T NB 38
project report
Assembly House - Hanoi, Vietnam
05.2016
Assembly House
2.050 m² Rising seating,
Type 2-600 with Combi T N36;
3.450 m² office area with Combi T N36
project report
2.050 m² Rising seating,
Type 2-600 with Combi T N36;
3.450 m² office area with Combi T N36
project report