BASF SE Ludwigshafen, Germany

    BASF SE Ludwigshafen, Germany

    BASF SE  Ludwigshafen, Germany

    The Butterfly Project - Dubai

    Butterfly Project - Dubai

    The Butterfly Project - Dubai

    PalaArmani - Home of the Armani Baskets

    The new stadion roof of the Pala Armani Baskets in Milan. 

    PalaArmani - Home of the Armani Baskets

    Docking System for Narrowbody Aircraft

    Airport-Technik strengthens its position in the Eastern European countries.
    Our long-term client „JAT Tehnika“ awarded MERO for the delivery of a complete new Docking System. The scope of work comprised engineering, manufacturing, transportation, MERO Supervision and start-up procedure. The modular built up system allows access to all maintenance related areas (Nose-to-Tail) of Narrowbody Aircraft since 2014.Jat kleinThe above mentioned system covers the complete Boeing B737NG Series (Next Generation) and also on Airbus A320 Aircraft. Fuselage- and Wing Docks allow maintenance and inspection works on above mentioned Aircraft types on wheels as well as on jacks by means of manual operated height adjustment whereas the Tail Dock is electrically height-adjustable.

    The MERO Docking System includes besides the steel substructure also the MERO KK-System, which allows due to its extreme lightweight construction an easy maneuverability of each single dock element and also quick docking procedures.
    Besides the accessibility of all maintenance related areas, the docking system also provides full electrical- and compressed air installation as well as sufficient illumination to guarantee safe and adequate working conditions.

    Data sheet

    A Jewel on Progress

    Location:Singapore  
    Architects: Safdie Architects and RSP Architects, Singapore
    Completion:...

    Space Management and Floor Systems – a Successful Alliance

    A Technical Look at the Use of Space ‘Above‘ and ‘Below‘
    The requirements on...

    Sound absorption at Audi H6/H7 building

    At the company headquarters in Ingolstadt, Audi Real Estate GmbH are erecting a new...

    Pala Armani - Stadium Roof of Armani Baskets

    Location: Milan, Italy
    Architects: TECO
    Client: Milanosport
    Completion: 2017
    Type of structure:...

    Doha Festival City Shopping Mall

    Location: Doha, Qatar
    Architects:DP Architects / Mace / Meinhardt
    Client:Bawabat...

    MERO-TSK Supervisors present their Company

            

    Live recording on Starfield Hanam Shopping Mall construction site in Seoul, Korea...

    The ceiling structure of a special kind

    The three-dimensional ceiling structure was the highlight of this year’s EnBW...

    Thermal conduction for data centers with MERO-steel air conditioning panels

    Raised access floors for data centers aren’t only used for bearing steadily...